Solution

Solution

Chongqing Expressway Group
  • Classification:Transportation
  • Author: Shengpu Weiner Energy Storage Technology
  • Source:
  • Release time:2026-07-06

User introduction

A major municipal project of Chongqing, it belongs to the 33rd connecting line in the Chongqing expressway network plan "Four Rings, Twenty-Two Radial Lines, and Sixty Connecting Lines." The route has a total length of 118.62 kilometers, constructed to the standard of a two-way four-lane expressway with a subgrade width of 25.50 meters and a design speed of 80 km/h.

Application scenarios

Wuxi to Kaizhou Expressway

Product Application

EP-KL Series Single Input Single Output, Three Input Three Output High Frequency Tower UPS (3-80kVA)*60 sets

National Service Hotline

0755-88695591

Authorized channel partner verification

©2025 Shenzhen Shengpu Weineng Storage Technology Co., Ltd.

Online Customer Service
Online
对方正在输入...
Feel free to contact us for any inquiries.